Staff

Nama : Prof.Ir. Bermawi Priyatna Iskandar M.Sc.,Ph.D.
Kelompok Keahlian : Sistem Manufaktur
Sekolah / Fakultas : Fakultas Teknologi Industri
Jabatan Fungsional : Guru Besar
S1 ITB Bandung Indonesia 1981
S2 ITB Bandung Indonesia 1985
S3 The University of Queensland Queensland Australia 1993
  • Model Kontrak Sewa (Lease Contract) Untuk Armada Alat Berat Pada Perusahaan Pertambangan (2019)
  • Model Layanan Purna Jual Untuk Alat Berat Remanufaktur (2019)
  • Seleksi mahasiswa sistem UTBK 2019 (2019)
  • Sistem Produk-Jasa Terpadu (Integrated Product-Service System) (2019)
  • Sistem Produk-Jasa Terpadu (Integrated Product-Service System) (2019)
  • KONTRAK PEMELIHARAAN ALAT BERAT MELIBATKAN TIGA PIHAK - PEMANUFAKTUR, AGEN DAN KONSUMEN DALAM SITUASI KOMPETITIF/KOOPERATIF (2018)
  • MODEL KONTRAK SEWA (LEASE CONTRACT) UNTUK ARMADA ALAT BERAT PADA PERUSAHAAN PERTAMBANGAN (2018)
  • MODEL LAYANAN PURNA JUAL UNTUK ALAT BERAT REMANUFAKTUR (2018)
  • KONTRAK PEMELIHARAAN ALAT BERAT MELIBATKAN TIGA PIHAK - PEMANUFAKTUR, AGEN DAN KONSUMEN DALAM SITUASI KOMPETITIF/KOOPERATIF (2017)
  • MODEL LAYANAN PURNA JUAL UNTUK ALAT BERAT REMANUFAKTUR (2017)
  • Kontrak pemeliharaan alat berat melibatkan tiga pihak -pemanufaktur, agen dan konsumen dalam situasi kompetisi/kooperasi (2016)
  • Kontrak Pemeliharaan Alat Berat Melibatkan Tiga Pihak Pemanufaktur, Agen dan Konsumen Dalam Situasi Kompetitif/Kooperatif (2016)
  • PEMODELAN KONTRAK PEMELIHARAAN TERINTERGRASI UNTUK ALAT BERAT DI PERTAMBANGAN (2016)
  • Indonesia Coast Guard Academy (ICGA) (2015)
  • Kontrak Pemeliharaan Armada Alat Berat Pada Industri Pertambangan ( Lanjutan) (2015)
  • Pemodelan Kontrak Pemeliharaan Terintegrasi Untuk Alat Berat di Pertambangan (2015)
  • Sosialisasi dan Promosi Seleksi Nasional Masuk Perguruan Tinggi Negeri Tahun 2015 (2015)
  • Kontrak Pemeliharaan Armada Alat Berat pada Industri Pertambangan (2014)
  • Kontrak Pemeliharaan Berbasis Performansi untuk Alat Berat (2014)
  • Management Proyek, Dana Kas Operasional Kantor Pengembangan ITB - JICA (DIPA) (2014)
  • Pemberian Bantuan Dana Riset Mobil Listrik Nasional (2014)
  • Pemodelan dan analisis kontrak pemeliharaan alat berat pada tambang terbuka batu bara dengan mempertimbangkan faktor beban/penggunaan dan waktu (perioda Kontrak) (2013)
  • Strategi perbaikan dan pemeliharaan pencegahan untuk meminimumkan ongkos garansi produk otomotif (2013)
  • Swakelola Analisa Rekomendasi Posisi Runding Dalam Bentuk Position Paper Mengenai Penyusunan Barang-Barang Lingkungan Indonesia (2013)
  • Technology deveopment for the biological production of dodecanedioic acid from the plantderived long-chain fatty acid (2013)
  • Keputusan Optimal untuk Kontrak Pemeliharaan Alat Berat yang Dipergunakan pada Industri Pertambangan (2012)
  • Pendekatan Terintegrasi untuk Pengurangan Ongkos Garansi (2011)
  • Dua Strategi Layanan Garansi Baru Untuk Produk Yang Dijual Dengan Garansi Satu Dimensi (2010)
  • Lease Contract with Availability Target and Price Discount (2019)
    Husniah H., Wangsaputra R., Iskandar B.P.
  • Optimal Lease Contract for Remanufactured Equipment (2018)
    Iskandar B.P., Wangsaputra R., Pasaribu U.S., Husniah H.
  • The impact of fleet size on remanufactured product with usage-based maintenance contract (2018)
    Husniah H., Cakravastia A., Iskandar B.P.
  • Lease contract in usage based remanufactured equipment service system (2018)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Bi-level optimization for maintenance service contracts involving three parties using genetic algori (2018)
    Sa\'Idah N.F., Cakravastia A., Pasaribu U.S., Iskandar B.P.
  • Two-dimensional lease contract model with coordination for new and used equipment (2018)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Game-Theoretic Models for Usage-based Maintenance Contract (2018)
    Husniah H., Wangsaputra R., Cakravastia A., Iskandar B.P.
  • Warranty cost for remanufactured product considering lemon laws (2018)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Optimal preventive maintenance for a two dimensional lease contract (2017)
    Bermawi Priyatna Iskandar , et al.
  • New warranty policies for a remanufactured product (2017)
    Iskandar B.P., Cakravastia A., Husniah H.
  • Optimal number of fleet maintenance contract with policy limit cost (2017)
    Husniah H., Supriatna A.K., Pasaribu U.S., Iskandar B.P.
  • Modelling two-dimensional lease contract with preventive maintenance and servicing strategy (2016)
    Husniah H., Iskandar B.P.
  • Two dimensional maintenance contract with coordination between owner and agent (2016)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • On the application of copula in modeling maintenance contract (2016)
    Iskandar B.P., Husniah H.
  • Performance based lease contract involving discrete preventive maintenance (2016)
    Pakpahan E.K.A., Iskandar B.P.
  • Analysis of Maintenance Service Contracts for Dump Trucks Used in Mining Industry with Simulation Ap (2016)
    Dymasius A., Wangsaputra R., Iskandar B.P.
  • Modelling and analysis of maintenance contract with imperfect preventive maintenance (2016)
    Husniah H., Cakravastia A., Iskandar B.P., Pasaribu U.S.
  • Optimal maintenance service contract involving discrete preventive maintenance using principal agent (2016)
    Pakpahan E.K.A., Iskandar B.P.
  • Optimal preventive maintenance for a fleet of dump trucks with two-dimensional lease contract (2016)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Performance-based maintenance contract for a fleet of dump trucks used in mining industry (2015)
    Iskandar B.P., Cakravastia A., Pasaribu U.S., Husniah H.
  • Service contract management with availability improvement and cost reduction (2015)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Optimal preventive maintenance for a two dimensional lease contract (2015)
    Iskandar B.P., Cakravastia A., Husniah H.
  • Maintenance service contract model for heavy equipment in mining industry using principal agent theo (2015)
    Pakpahan E.K.A., Iskandar B.P.
  • Improving service contract management with availability and negotiation (2015)
    Husniah H., Supriatna A.K., Iskandar B.P.
  • Maintenance service contracts for equipment sold with two dimensional warranties (2014)
    Iskandar B.P., Husniah H., Pasaribu U.S.
  • Performance-based maintenance contract for equipments used in mining industry (2014)
    Husniah H., Pasaribu U.S., Cakravastia A., Iskandar B.P.
  • Two dimensional maintenance contracts for a fleet of dump trucks used in mining industry (2014)
    Husniah H., Pasaribu U.S., Cakravastia A., Iskandar B.P.
  • Maintenance service contracts for a fleet of dump trucks used in mining industry (2014)
    Bermawi Priyatna Iskandar , et al.
  • Optimal overhaul-replacement policies for a repairable machine sold with warranty (2014)
    Soemadi K., Iskandar B.P., Taroepratjeka H.
  • Last time buy decisions for products sold under warranty (2013)
    Van Der Heijden M., Iskandar B.P.
  • A servicing strategy involving imperfect repair for two-dimensional warranties (2013)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Optimization of fly ash and silica fume as materials subtitution for cement with ternary sistem C-A- (2013)
    Bermawi Priyatna Iskandar , et al.
  • A servicing strategy involving preventive maintenance and imperfect repair for two dimensional warra (2013)
    Husniah H., Pasaribu U.S., Iskandar B.P.
  • Performanced based two maintenance contracts for equipment sold with two dimensional warranties (2013)
    Iskandar B.P., Pasaribu U.S., Husniah H.
  • Two new servicing strategies for products sold with warranty (2012)
    Iskandar B.P., Jack N., Murthy D.N.P.
  • Servicing strategy and preventive maintenance for products sold with one-dimensional warranties (2012)
    Makmoen M., Cakravastia A., Irianto D., Iskandar B.P.
  • Cost and availability functions using imperfect maintenance policy for a serial system (2012)
    Nursanti E., Ma\'ruf A., Simatupang T., Iskandar B.P.
  • Renewal process in two-dimensional repairable products (2012)
    Pasaribu U.S., Husniah H., Iskandar B.P.
  • Stochastic system in discrete preventive maintenance and service contract (2012)
    Pasaribu U.S., Husniah H., Iskandar B.P.
  • Warranty servicing with imperfect repair for products sold with a two-dimensional warranty (2011)
    Iskandar B.P., Jack N.
  • A maintenance service contract for a warranted product (2011)
    Husniah H., Pasaribu U.S., Halim A.H., Iskandar B.P.
  • A repair-replace strategy based on usage rate for items sold with a two-dimensional warranty (2009)
    Jack N., Iskandar B.P., Murthy D.N.P.
  • Joint economic lot size model with quality improvement for a single supplier and a single buyer coop (2009)
    Saraswati D., Cakravastia A., Iskandar B.P., Halim A.H.
  • A new repair-replace strategy for items sold with a two-dimensional warranty (2005)
    Iskandar B.P., Murthy D.N.P., Jack N.
  • Repair-Replace Strategies for Two-Dimensional Warranty Policies (2003)
    Iskandar B.P., Murthy D.N.P.
  • Comments on "maintenance policies with two-dimensional warranty" (2003)
    Jack N., Murthy D.N.P., Iskandar B.P., Chen T.-M., Popova E.
  • An extended opportunity-based age replacement policy (2000)
    Iskandar B.P., Sandoh H.
  • An opportunity-based age replacement policy considering warranty (1999)
    Iskandar B.P.
  • Two-dimensional failure-free warranty policies: Two-dimensional point process models (1995)
    Bermawi Priyatna Iskandar , et al.
  • A simulation approach to analysis of free replacement policies (1992)
    Bermawi Priyatna Iskandar , et al.
  • A new shock damage model: Part II-Optimal maintenance policies (1991)
    Bermawi Priyatna Iskandar , et al.
  • A new shock damage model: Part I-Model formulation and analysis (1991)
    Bermawi Priyatna Iskandar , et al.
  • Reply to vesely s comments on a new shock damage model: Part I-Model formulation and analysis (1991)
    Bermawi Priyatna Iskandar , et al.
  • Reply to vesely s comments on a new shock damage model: Part II-Optimal maintenance policies (1991)
    Bermawi Priyatna Iskandar , et al.
  • Reply by Murthy Iskandar (1991)
    Bermawi Priyatna Iskandar , et al.