Staff

Nama : Prof.Ir. N.R. Reini Djuhraeni W. MSCE,Ph.D.
Kelompok Keahlian : Manajemen dan Rekayasa Konstruksi
Sekolah / Fakultas : Fakultas Teknik Sipil dan Lingkungan
Jabatan Fungsional : Guru Besar
S1 ITB Bandung Indonesia 1991
S2 Purdue University The State of Indiana USA 1996
S3 Purdue University The State of Indiana Amerika Serikat 1999
  • Management Proyek, Dana Kas Operasional Kantor Pengembangan ITB - JICA (DIPA) (2014)
  • Pengembangan Model Evaluasi Berbasis Risiko dalam Tender Konsensi Infrastruktur Jalan (2013)
  • Study on Application of NSHyper - Beam Sections for Bridge Structures (2013)
  • Pengembangan Model Evaluasi Berbasi Resiko Dalam Tender Konsesi Infrastruktur Jalan (2012)
  • Study and design Hat + Steel Sheet piles (2012)
  • Study and Design of Rolled H-Shape Nittesuhyper Beam (2012)
  • Study and Design of Sheet piles (2012)
  • The Triple Helix Conference X Indonesia 2012 (2012)
  • System Development (SDV) 2011 SUB COMPONENT B.2c GRANTS FOR PERFORMANCE BASED CONTRACT (2011)
  • Revitalisasi Pusat Studi Lingkungan Hidup Institut Teknologi Bandung (2010)
  • Pengembangan Model dan Kelayakan Implementasi Pengelolaan Rantai Pasok Proyek Infrastruktur oleh Pemilik (2009)
  • Wirahadikusumah, R., Susanti, B., Coffey, V., Adighibe, C. (2015) Performance-based contracting for roads-Experiences of Australia and Indonesia, Procedia Engineering, Vol. 125, pp. 5-11. DOI: 10.1016/j.proeng.2015.11.002(Internasional)
  • Wirahadikusumah, R.D., Ario, D. (2015) A readiness assessment model for Indonesian contractors in implementing sustainability principles, International Journal of Construction Management, Vol. 15, Issue 2, pp. 126-136. DOI: 10.1080/15623599.2015.1033817(Internasional)
  • Wirahadikusumah, R., Susanti, B., Safitri, S., Soemardi, B. (2013) Concession award for Indonesian toll roads-A comparison analysis, ISEC 2013-7th International Structural Engineering and Construction Conference: New Developments in Structural Engineering and Construction, pp. 1591-1596. DOI: 10.3850/978-981-07-5354-2-p-4-359(Internasional)
  • Wirahadikusumah, R.D., Sulistyaningsih, D. (2013) The role of owners in the supply chains of highway construction projects: An overview of indonesian cases, 21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013, pp. 795-804. (Internasional)
  • Abduh, M., Soemardi, B.W., Wirahadikusumah, R.D. (2012) Indonesian construction supply chains cost structure and factors: A case study of two projects, Journal of Civil Engineering and Management, Vol. 18, Issue 2, pp. 209-216. DOI: 10.3846/13923730.2012.671259(Internasional)
  • Soekiman, A., Pribadi, K.S., Soemardi, B.W., Wirahadikusumah, R.D. (2011) Factors relating to labor productivity affecting the project schedule performance in Indonesia, Procedia Engineering, Vol. 14, pp. 865-873. DOI: 10.1016/j.proeng.2011.07.110(Internasional)
  • Wirahadikusumah, R.D., Pribadi, K.S. (2011) Licensing construction workforce: Indonesias effort on improving the quality of national construction industry, Engineering, Construction and Architectural Management, Vol. 18, Issue 5, pp. 431-443. DOI: 10.1108/09699981111165158(Internasional)
  • Soemardi, B.W., Wirahadikusumah, R.D. (2009) The Indonesian Construction Law: Challenges toward Globalization, COBRA 2009-Construction and Building Research Conference of the Royal Institution of Chartered Surveyors, pp. 1223-1233. (Internasional)
  • Latupeirissa, J.E., Marzuki, P.F., Wirahadikusumah, R.D. (2008) The framework of contingency cost determination in the construction execution, EASEC-11-Eleventh East Asia-Pacific Conference on Structural Engineering and Construction. (Internasional)
  • Abduh, M., Wirahadikusumah, R.D. (2006) The application of merit-point system for selecting contractors in Indonesia, Construction and Professional Practices-Proceedings of the 10th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC 2010, Vol. 5, pp. 157-162. (Internasional)
  • Abraham, D.M., Wirahadikusumah, R. (2005) Life cycle cost analysis for the selection of optimal renewal strategies in infrastructure, International Society for Trenchless Technology-23rd No-Dig International Conference and Exhibition, No-Dig 2005, pp. 39-48. (Internasional)
  • Wirahadikusumah, R., Abraham, D.M. (2003) Application of dynamic programming and simulation for sewer management, Engineering, Construction and Architectural Management, Vol. 10, Issue 3, pp. 193-208. DOI: 10.1108/09699980310478449(Internasional)
  • Wirahadikusumah, R., Abraham, D., Iseley, T. (2001) Challenging issues in modeling deterioration of combined sewers, Journal of Infrastructure Systems, Vol. 7, Issue 2, pp. 77-84. DOI: 10.1061/(ASCE)1076-0342(2001)7:2(77)(Internasional)
  • Abraham, D.M., Wirahadikusumah, R., Short, T.J., Shahbahrami, S. (1998) Optimization modeling for sewer network management, Journal of Construction Engineering and Management, Vol. 124, Issue 5, pp. 402-410. (Internasional)
  • Wirahadikusumah, R., Abraham, D.M., Iseley, T., Prasanth, R.K. (1998) Assessment technologies for sewer system rehabilitation, Automation in Construction, Vol. 7, Issue 4, pp. 259-270. (Internasional)
  • Abraham, Dulcy M., Iseley, Tom, Prasanth, Ravi K., Wirahadikusumah, Reini (1997) Integrating sensing technologies for underground utility assessment, Proceedings of the Speciality Conference on Infrastructure Condition Assessmenr: Art, Science, Practice, pp. 316-325. (Internasional)